# US 10,480,315 B2 · Average/initial reservoir pressure and wellbore efficiency analysis from rates and downhole pressures

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,480,315 B2
- Document ID: US10480315B2
- Status: Granted
- Kind: B2
- Application number: 15/017,279
- Filed: 2016-02-05
- Published: 2016-10-20
- Granted: 2019-11-19
- Earliest claimed: 2015-02-06
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Varma Gottumukkala; Bobby Dale Poe, Jr.
- Web page: https://patentgrep.com/patent/US10480315B2

## CPC

- E21B 49/0875: {determining specific fluid parameters}
- E21B 47/07: Temperature
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Systems and methods for calculating reservoir characteristics, including well pressure and flow rates are disclosed. Plotting and monitoring a plot of pressure (p) and flow rate (q) as p/q on a y-axis and 1/q on an x-axis can provide insight into well characteristics with zero RMS error.

## Claims

### Claim 1

A method of characterizing parameters of a reservoir, comprising:
acquiring transient well production data for a well producing fluid from the reservoir;
using the transient well production data for obtaining a reservoir pressure, p, for the reservoir and a reservoir flow rate, q;
plotting p/q on a first axis, and 1/q on a second axis wherein the plot of p/q and 1/q comprises a first time and a second time;
using the plot, while producing fluid from the reservoir, identifying a change in reservoir characteristics between the first time and the second time; and
based on the identified change, controlling well completion components to enhance producing fluid from the reservoir.

### Claim 2 (depends on 1)

The method of claim 1, further comprising formulating a remedial plan to address issues in well performance.

### Claim 3

A method of reviving a reservoir, comprising:
acquiring transient well production data for a well producing fluid from the reservoir;
using the transient well production data for:
obtaining a reservoir effective permeability, k,
a reservoir net pay thickness, h,
an initial reservoir pressure, Pi,
a reservoir flow rate, q,
a viscosity of oil in the well, μ, and
a formation volume factor, B;
calculating a dimensionless parameter for wellbore pressure, PwD; and
calculating a number Pwf/q, according to the equation:
Pwf/q=Pi(1/q)−CμBPwD/kh, wherein C is a constant;
plotting the parameters p and q with p/q on a y-axis and 1/q on the x-axis wherein the plot of p/q and 1/q is monitored with respect to time to determine changes in the reservoir characteristics; and
based on the determined changes, reviving well production from the reservoir.

### Claim 4

A method comprising:
acquiring wellbore flow rate data and wellbore pressure data of a wellbore of a well in fluid communication with a reservoir with respect to time;
determining a slope and an intercept of a line using points in time for the wellbore pressure data divided by the wellbore flow rate data with respect to reciprocal wellbore flow rate data, wherein the division of the wellbore pressure data by the wellbore flow rate data and the reciprocal wellbore flow rate increase a coefficient of determination of the line, wherein the slope corresponds to an average reservoir pressure with respect to time and wherein the intercept corresponds to reservoir characteristics with respect to time;
while producing fluid from the well, determining a change in reservoir characteristics with respect to time using the intercept; and
reviving production of fluid from the well using the change in reservoir characteristics with respect to time.

### Claim 5 (depends on 4)

The method of claim 4 wherein the reservoir characteristics depend on a reservoir effective permeability, k, and the change corresponds to a change in the reservoir effective permeability.

### Claim 6 (depends on 4)

The method of claim 4 wherein the reservoir characteristics depend on a reservoir net pay thickness, h, and the change corresponds to a change in the reservoir effective permeability.

### Claim 7 (depends on 4)

The method of claim 4 wherein the reservoir characteristics depend on a formation volume factor, B, and the change corresponds to a change in the reservoir effective permeability.

### Claim 8 (depends on 4)

The method of claim 4 wherein acquiring the wellbore pressure data comprises receiving the wellbore pressure data from a downhole pressure gauge.

### Claim 9 (depends on 4)

The method of claim 4 wherein acquiring the wellbore flow rate data comprises receiving the wellbore flow rate data from a downhole flow meter.

### Claim 10 (depends on 4)

The method of claim 4 wherein acquiring the wellbore flow rate data comprises receiving the wellbore flow rate data from a surface flow meter.

### Claim 11 (depends on 4)

The method of claim 4 wherein the wellbore pressure data comprise sandface flowing pressure data.

### Claim 12 (depends on 4)

The method of claim 4 comprising determining an initial reservoir pressure value using the slope and wellbore flow rate data that extends in time to a start of fluid production from the well.

### Claim 13 (depends on 4)

The method of claim 4 comprising tracking the intercept in real time as an indicator of changes in reservoir/wellbore performance.

### Claim 14 (depends on 4)

The method of claim 4 comprising tracking the intercept in real time as an indicator of changes in well completion effectiveness.

### Claim 15 (depends on 4)

The method of claim 4 wherein the acquiring wellbore flow rate data and wellbore pressure data and the determining a change in reservoir characteristics with respect to time using the intercept are performed in real time.

### Claim 16 (depends on 15)

The method of claim 15 wherein the acquiring wellbore flow rate data and wellbore pressure data and the determining a change in reservoir characteristics with respect to time using the intercept are performed without shutting in the well.

### Claim 17 (depends on 4)

The method of claim 4 wherein the acquiring wellbore flow rate data and wellbore pressure data and the determining a change in reservoir characteristics with respect to time using the intercept are performed without shutting in the well.
