Technologies for assigning workloads based on resource utilization phases
AssigneeIntel Corporation
InventorsSusanne M. Balle, Rahul Khanna, Nishi Ahuja, Mrittika Ganguli
Life of this patent
Estimating the term…
Loading patent…
AssigneeIntel Corporation
InventorsSusanne M. Balle, Rahul Khanna, Nishi Ahuja, Mrittika Ganguli
Estimating the term…
Technologies for assigning workloads based on resource utilization phases include an orchestrator server to assign a set of workloads to the managed nodes. The orchestrator server is also to receive telemetry data from the managed nodes and identify, as a function of the telemetry data, historical resource utilization phases of the workloads. Further, the orchestrator server is to determine, as a function of the historical resource utilization phases and as the workloads are performed, predicted resource utilization phases for the workloads, and apply, as a function of the predicted resources utilization phases, adjustments to the assignments of the workloads among the managed nodes as the workloads are performed.
An orchestrator server to assign workloads among a set of managed nodes based on resource utilization phases, the orchestrator server comprising:
One or more non-transitory machine-readable storage media comprising a plurality of instructions stored thereon that, in response to being executed, cause an orchestrator server to:
An orchestrator server to assign workloads among a set of managed nodes based on resource utilization phases, the orchestrator server comprising:
A method for assigning workloads among a set of managed nodes based on resource utilization phases, the method comprising:
Dependencies are inferred from the claim text.