Horizon monitoring for longwall system
AssigneeJoy Global Underground Mining LLC
InventorsPaul M. Siegrist, Nigel J. Buttery, Lachlan Palmer
Life of this patent
Estimating the term…
Loading patent…
AssigneeJoy Global Underground Mining LLC
InventorsPaul M. Siegrist, Nigel J. Buttery, Lachlan Palmer
Estimating the term…
A method of monitoring a longwall shearing mining machine in a longwall mining system, wherein the shearing mining machine includes a shearer having a first cutter drum and a second cutter drum, includes receiving, by a processor, shearer position data over a shear cycle. The horizon profile data includes information regarding at least one of the group comprising of a position and angle of the shearer, a position of the first cutter drum, and a position of the second cutter drum. The method also includes analyzing the shearer position data, by the processor, to determine whether a position failure occurred during the shear cycle based on whether the computed horizon profile data was within normal operational parameters during the shear cycle, and generating an alert upon determining that the position failure occurred during the shear cycle.
A monitoring device for a longwall mining system including a shearer having a first cutter drum, a second cutter drum, and a first sensor to determine a position of at least one of the shearer, the first cutter drum, and the second cutter drum over a shear cycle, the monitoring device comprising:
A method of monitoring a longwall shearing mining machine in a longwall mining system, the shearing mining machine including a shearer having a first cutter drum and a second cutter drum, the method comprising:
Dependencies are inferred from the claim text.