Bypass flushing for gas extraction systems
AssigneeHalliburton Energy Services, Inc.
InventorsPrashant Shekhar, Gillies Alexander MacDonald, Robert James Costo, Jr.
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Energy Services, Inc.
InventorsPrashant Shekhar, Gillies Alexander MacDonald, Robert James Costo, Jr.
Estimating the term…
A method of operating a gas extraction system includes receiving a drilling fluid sample at a flow meter via a flow meter inlet conduit and discharging the drilling fluid sample into a flow meter outlet conduit. A first inline mud valve positioned in the flow meter inlet conduit and a second inline mud valve positioned in the flow meter outlet conduit are each closed to transition the gas extraction system to a bypass flushing configuration. A bypass flow meter valve positioned in a flow meter bypass conduit is opened to divert the drilling fluid sample around the flow meter. The flow meter is then flushed with flushing fluid by opening first and second flow meter flushing valves and starting a pump to circulate the flushing fluid through the flow meter.
A gas extraction system, comprising:
Dependencies are inferred from the claim text.