Control systems and methods to optimize machine placement for additive construction operations
AssigneeCaterpillar Inc.
InventorsPaul Friend, Qi Chen, Jean-Jacques Clar
Life of this patent
Estimating the term…
Loading patent…
AssigneeCaterpillar Inc.
InventorsPaul Friend, Qi Chen, Jean-Jacques Clar
Estimating the term…
A control system for a machine, operating on a worksite is associated with an implement, which perform additive construction operations in accordance with a pre-determined implement control plan. The system includes a positioning system, one or more implement control actuators, and a controller. The positioning system is configured to determine positioning signals associated with, at least, a terrain of the worksite and any worksite objects existing thereon. The controller determine an available zone, in which the machine and implement are capable of executing the additive construction operations within the available zone, based on the positioning signals and the pre-determined implement control plan, and determine an operation zone, relative to a desired additive construction site on the worksite, within the available zone, wherein parameters of the operation zone are based, at least in part, on the available zone, the machine configuration, and the pre-determined implement control plan.
A control system for a machine operating on a worksite, the machine associated with an implement configured to perform an additive construction operation in accordance with a pre-determined implement control plan, the system including:
A method for optimizing positioning of a machine and an implement associated with the machine, the implement configured for performing an additive construction operation, at a worksite, in accordance with a pre-determined implement control plan, the machine having a machine configuration, the machine configuration including an implement range of motion and a machine footprint, the method comprising:
A system for performing additive construction operations on a worksite, the additive construction operations associated with a pre-determined implement control plan, the system comprising:
Dependencies are inferred from the claim text.