# US 10,371,728 B2 · Self-calibrating contactless power consumption sensing

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,371,728 B2
- Document ID: US10371728B2
- Status: Granted
- Kind: B2
- Application number: 15/707,850
- Filed: 2017-09-18
- Published: 2018-01-04
- Granted: 2019-08-06
- Earliest claimed: 2009-09-25
- Assignees: Belkin International, Inc.
- Applicants: Belkin International, Inc.
- Inventors: Shwetak N. Patel; Sidhant Gupta; Matthew S. Reynolds
- Web page: https://patentgrep.com/patent/US10371728B2

## CPC

- G01R 21/00: Arrangements for measuring electric power or power factor (G01R7/12 takes precedence)
- G01R 15/207: {Constructional details independent of the type of device used}
- G01R 35/00: Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R 21/001: {Measuring real or reactive component; Measuring apparent energy (G01R21/01, G01R21/02, G01R21/08, G01R21/10 and G01R21/127 take precedence)}
- G01R 21/06: by measuring current and voltage (G01R21/08 - G01R21/133 take precedence)
- G01R 22/063: {related to remote communication}
- G01R 35/005: {Calibrating; Standards or reference devices, e.g. voltage or resistance standards, "golden" references (G01R33/0035, G01R35/002 take precedence)}
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)

## Abstract

A method of sensing electrical power being provided to a structure using a sensing device, a calibration device, and one or more processing modules. The sensing device can include one or more magnetic field sensors. The sensing device can be attached to a panel of a circuit breaker box. The panel of the circuit breaker box can overlie at least a part of one or more main electrical power supply lines for an electrical power infrastructure of a structure. The calibration device can include a load unit. The calibration device can be electrically coupled to the electrical power infrastructure of the structure. The method can include automatically calibrating the sensing device by determining a first transfer function in a piecewise manner based on a plurality of ordinary power consumption changes in the structure. The method also can include determining a power consumption measurement using the one or more processing modules based on one or more output signals of the sensing device and the first transfer function. Other embodiments are provided.

## Claims

### Claim 1

A method of sensing electrical power being provided to a structure using a sensing device, a calibration device, and one or more processing modules, the sensing device comprising one or more magnetic field sensors, the sensing device being attached to a panel of a circuit breaker box, the panel of the circuit breaker box overlying at least a part of one or more main electrical power supply lines for an electrical power infrastructure of a structure, the calibration device comprising a load unit, the calibration device being electrically coupled to the electrical power infrastructure of the structure, the method comprising:
automatically calibrating the sensing device by determining a first transfer function in a piecewise manner based on a plurality of ordinary power consumption changes in the structure; and
determining a power consumption measurement using the one or more processing modules based on one or more output signals of the sensing device and the first transfer function, wherein: the load unit of the calibration device is configured to draw a range of loads; after the sensing device is calibrated, the one or more processing modules are configured to use the sensing device to determine a range of power consumption measurements; and the range of loads is less than the range of power consumption measurements.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
automatically calibrating the sensing device by determining the first transfer function in the piecewise manner based on the plurality of ordinary power consumption changes in the structure over a first time period comprises:
iteratively predicting the first transfer function by the one or more processing modules based at least in part on (a) measured regions of magnetic flux measured by the sensing device before and after the load unit of the calibration device applies a load and (b) extrapolated regions outside the measured regions.

### Claim 3 (depends on 1)

The method of claim 1, wherein:
automatically calibrating the sensing device by determining the first transfer function in the piecewise manner based on the plurality of ordinary power consumption changes in the structure is performed over a first time period; and
the first time period is at least 48 hours.

### Claim 4 (depends on 1)

The method of claim 1, wherein:
the load unit of the calibration device is configured to provide a maximum load of no more than 1000 watts.

### Claim 5 (depends on 1)

The method of claim 1, wherein:
the load unit of the calibration device is configured to provide a maximum load of no more than 300 watts.

### Claim 6 (depends on 1)

The method of claim 1, wherein:
the load unit of the calibration device is configured to draw no more than four discrete loads.

### Claim 7 (depends on 1)

The method of claim 1, wherein:
the range of loads is less than 20% of the range of power consumption measurements.

### Claim 8 (depends on 1)

The method of claim 1, wherein:
determining the power consumption measurement using the one or more processing modules based on the one or more output signals of the sensing device and the first transfer function comprises:
determining a phase difference between an electrical current flowing in the one or more main electrical power supply lines and a voltage of the one or more main electrical power supply lines.

### Claim 9 (depends on 8)

The method of claim 8, wherein:
determining the power consumption measurement using the one or more processing modules based on the one or more output signals of the sensing device and the first transfer function further comprises:
determining a real power usage based at least in part on the phase difference.

### Claim 10

A method of sensing electrical power being provided to a structure using a sensing device, a calibration device, and one or more processing modules, the sensing device being attached to a panel of a circuit breaker box, the panel of the circuit breaker box overlying at least a part of one or more main electrical power supply lines for an electrical power infrastructure of a structure, the calibration device comprising a load unit, the method comprising:
determining a current flowing in the one or more main electrical power supply lines based at least in part on one or more output signals of the sensing device; and
determining a phase difference between the current flowing in the one or more main electrical power supply lines and a voltage of the one or more main electrical power supply lines measured by the calibration device,
wherein:
the calibration device is electrically coupled to the electrical power infrastructure of the structure;
the sensing device comprises one or more magnetic field sensors configured to measure a magnetic flux produced by at least a part of the one or more main electrical power supply lines and generate the one or more output signals of the sensing device based on the magnetic flux measured by the sensing device;
the sensing device is devoid of being electrically or physically coupled to the one or more main electrical power supply lines; the load unit of the calibration device is configured to draw a range of loads; the one or more processing modules are configured to use the sensing device to determine a range of electrical power usage; and the range of loads is less than the range of the electrical power usage.

### Claim 11 (depends on 10)

The method of claim 10, wherein:
determining the phase difference between the current flowing in the one or more main electrical power supply lines and the voltage measured by the calibration device electrically coupled to the electrical power infrastructure of the structure comprises:
determining a phase of the current based on a phase of the magnetic flux measured by the sensing device.

### Claim 12 (depends on 10)

The method of claim 10 further comprising:
determining a real power usage based at least in part on the phase difference.

### Claim 13 (depends on 12)

The method of claim 12, wherein:
the one or more processing modules are configured to determine the real power usage when the sensing device is devoid of being located at a predetermined location over the panel.

### Claim 14 (depends on 12)

The method of claim 12, wherein:
the one or more processing modules are configured to determine the current flowing in the one or more main electrical power supply lines when the sensing device is coupled at any location over the panel, based at least in part on the one or more output signals received from the sensing device.

### Claim 15 (depends on 10)

The method of claim 10, wherein:
the sensing device further comprises one or more magnets surrounding the one or more magnetic field sensors, the one or more magnets being configured to saturate a magnetic field induced by the panel.

### Claim 16 (depends on 10)

The method of claim 10, wherein:
the load unit of the calibration device is configured to provide a maximum load of no more than 1000 watts.

### Claim 17 (depends on 10)

The method of claim 10, wherein:
the load unit of the calibration device is configured to provide a maximum load of no more than 300 watts.

### Claim 18 (depends on 10)

The method of claim 10, wherein:
the load unit of the calibration device is configured to draw no more than four discrete loads.

### Claim 19 (depends on 10)

The method of claim 10, wherein:
the range of loads is less than 20% of the range of the electrical power usage.