# US 10,370,955 B2 · Method of calculating pore pressure while drilling

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,370,955 B2
- Document ID: US10370955B2
- Status: Granted
- Kind: B2
- Application number: 14/645,535
- Filed: 2015-03-12
- Published: 2016-09-15
- Granted: 2019-08-06
- Earliest claimed: 2015-03-12
- Assignees: Statoil Gulf Services LLC
- Applicants: Statoil Gulf Services LLC
- Inventors: Giuseppe De Prisco
- Web page: https://patentgrep.com/patent/US10370955B2

## CPC

- E21B 49/003: {by analysing drilling variables or conditions (E21B49/005 takes precedence; systems specially adapted for monitoring a plurality of drilling variables or conditions E21B44/00)}
- G01V 3/38: Processing data, e.g. for analysis, for interpretation, for correction
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

A method for calculating pore pressure of a subsurface includes the steps of obtaining a resistivity value while drilling in a region wherein there is a shallow depth (reference depth) where shale is in a hydrostatic condition, or where shale is not in hydrostatic condition but where the pore pressure at such depth can be estimated and calculating, using a processor, a pore pressure at a drilling location based on the following Formula (I): PP=OvB−(OvB−Hyd)(R/R0)øn wherein PP is pore pressure, OvB is the overburden value associated with the drilling location, Hyd is hydrostatic pore pressure, R is a measured value of resistivity, R0 is the resistivity at a reference depth or is an imposed value of resistivity, and øn is a normalized value of porosity.

## Claims

### Claim 1

A method of estimating pore pressure (PP) of a subsurface at a drilling location, the method comprising:
measuring a resistivity value (R0) while drilling in a region having a pore pressure (PP[depth of reference]) that is known or can be approximated at a depth of reference;
determining from the resistivity value (R0) and the pore pressure (PP[depth of reference]) at the depth of reference an imposed resistivity value (R0[depth of reference]) at the depth of reference;
measuring a resistivity value (R) in an interval of the subsurface from the depth of reference to a depth of the drilling location;
calculating, using a processor, the pore pressure (PP) at the drilling location based on the following Formula (I):
PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
wherein PP is the pore pressure, OvB is an overburden pressure value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured resistivity value for the interval from the depth of reference to the depth of the drilling location, R0[depth of reference] is the imposed resistivity value at the depth of reference, and øn is a normalized value of porosity;
adjusting, using the processors, a drilling operation associated with a new drilling location based on the estimated pore pressure, wherein said adjusting comprises optimizing a number of casing strings in the borehole; and
repeating the steps of the method using the depth of the drilling location as a new depth of reference to estimate pore pressure at the new drilling location of the subsurface wherein a pore pressure at the new depth of reference is the estimated pore pressure (PP) at the drilling location.

### Claim 2 (depends on 1)

The method of claim 1, wherein adjusting the drilling operation further comprises at least one of adjusting a drilling fluid density and adjusting a drilling trajectory.

### Claim 3 (depends on 1)

The method of claim 1, wherein the drilling location comprises a location below an operating drill bit in a borehole.

### Claim 4 (depends on 1)

The method of claim 1, wherein the estimated pore pressure is displayed on a graphical user interface.

### Claim 5

A non-transitory computer readable medium comprising instructions to perform a method for pore pressure (PP) estimation at a drilling location of a subsurface, the instructions executable on a processor and comprising functionality for:
measuring a resistivity value (R0) while drilling in a region having a pore pressure (PP[depth of reference]) that is known or can be approximated at a depth of reference;
determining from the resistivity value (R0) and the pore pressure (PP[depth of reference]) at the depth of reference an imposed resistivity value (R0[depth of reference]) at the depth of reference;
measuring a resistivity value (R) in an interval of the subsurface from the depth of reference to a depth of the drilling location;
calculating, using a processor, the pore pressure (PP) at the drilling location based on the following Formula (I):
PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
wherein PP is the pore pressure, OvB is an overburden pressure value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured resistivity value for the interval from the depth of reference to the depth of the drilling location, R0[depth of reference] is the imposed resistivity value at the depth of reference, and øn is a normalized value of porosity;
adjusting, using the processors, a drilling operation associated with a new drilling location based on the estimated pore pressure, wherein said adjusting comprises optimizing a number of casing strings in the borehole; and
repeating the steps of the method using the depth of the drilling location as a new depth of reference to estimate pore pressure at the new drilling location of the subsurface wherein a pore pressure at the new depth of reference is the estimated pore pressure (PP) at the drilling location.

### Claim 6 (depends on 5)

The non-transitory computer readable medium of claim 5 wherein adjusting the drilling operation comprises at least one selected from the group consisting of adjusting a drilling fluid density and adjusting a drilling trajectory.

### Claim 7 (depends on 5)

The non-transitory computer readable medium of claim 5, wherein the drilling location comprises a location below an operating drill bit in a borehole.

### Claim 8 (depends on 5)

The non-transitory computer readable medium of claim 5, wherein the estimated pore pressure is displayed on a graphical user interface.

### Claim 9

A downhole tool configured to perform a method for pore pressure (PP) estimation at a drilling location of a subsurface, the downhole tool comprising:
a processor;
a memory comprising software instructions for enabling the downhole tool under control of the processor to:
measure a resistivity value (R0) while drilling in a region having a pore pressure (PP[depth of reference]) that is known or can be approximated at a depth of reference;
determine from the resistivity value (R0) and the pore pressure (PP[depth of reference]) at the depth of reference an imposed resistivity value (R0[depth of reference]) at the depth of reference;
measure a resistivity value (R) in an interval of the subsurface from the depth of reference to a depth of the drilling location;
calculate, using a processor, the pore pressure at the drilling location based on the following Formula (I):
PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
wherein PP is the pore pressure, OvB is an overburden pressure value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured resistivity value for the interval from the depth of reference to the depth of the drilling location, R0[depth of reference] is the imposed resistivity value at the depth of reference, and on is a normalized value of porosity;
adjust, using the processors, a drilling operation associated with a new drilling location based on the estimated pore pressure, wherein said adjusting comprises optimizing a number of casing strings in the borehole; and
repeat the steps of the method using the depth of the drilling location as a new depth of reference to estimate pore pressure at the new drilling location of the subsurface wherein a pore pressure at the new depth of reference is the estimated pore pressure (PP) at the drilling location.

### Claim 10 (depends on 9)

The downhole tool of claim 9, wherein adjusting the drilling operation comprises at least one selected from the group consisting of adjusting a drilling fluid density and adjusting a drilling trajectory.

### Claim 11 (depends on 9)

The downhole tool of claim 9, wherein the drilling location comprises a location below an operating drill bit in a borehole.

### Claim 12 (depends on 9)

The downhole tool of claim 9, wherein the estimated pore pressure is displayed on a graphical user interface.
