Tunnel construction method using pre-support and post-support and apparatus suitable for same
OwnerDong-hyun Seo, Min-kyu Seoinventors
Life of this patent
Estimating the term…
Loading patent…
OwnerDong-hyun Seo, Min-kyu Seoinventors
Estimating the term…
The present invention relates to a tunneling method, and particularly, to a tunneling method by installing an internal pre-support member and a corresponding post support member in an alternate manner or by installing an external pre-support member and a corresponding post support member in an alternate manner, and an apparatus, respectively, therefor. The tunneling method includes: excavating a pilot tunnel in a main tunnel to be constructed; radially forming a drilled hole from an excavation surface of the pilot tunnel to a tip end of the pre-support member of the main tunnel at a plurality of locations in the pilot tunnel to install the pre-support member; inserting the pre-support member into the drilled hole, and conducting grouting and performing curing to fix the pre-support member; excavating the tunnel in stages in a longitudinal direction along an excavation line of the main tunnel and primarily spraying shotcrete to an excavation surface of the main tunnel in the main tunnel; installing a post-support member between a plurality of the pre-support members on the main tunnel surface to which the shotcrete is primarily sprayed; and connecting the pre-support member and the post-support member with a plate type support member.
A tunneling method using an internal pre-support member and a post-support member, the tunneling method comprising the steps of:
A tunneling method using an external pre-support member and a post-support member, the tunneling method comprising the steps of:
Dependencies are inferred from the claim text.