Foundation pier system and method
OwnerJeffrey W. Teague, Vincent E. Branamaninventors
Life of this patent
Estimating the term…
Abstract
A concentrically loaded foundation pier system which includes several concentrically stacked steel pipes filled with concrete. The entire pier is installed centrally beneath the footing of the structure. Shims are placed between the top-most pier element and a pier cap which prevents shifting when the soil expands and contracts. The final structure is end-loaded and pressed to the bedrock or other load-bearing strata. An alternative embodiment includes a temporary lifting assembly which can be fastened about the structural pier without need for bolts or other fasteners.
Claims13
A foundation pier system comprising:
- a base pier segment, a top pier segment, and a plurality of primary foundation pier segments;
- a pier cap assembly configured to encompass at least a portion of said top pier segment, said pier cap assembly engaged with a structural element;
- said pier cap assembly comprising a first plate and a second plate;
- at least one shim installed within said pier cap assembly and about said top-most pier segment;
- a lifting platform configured to be temporarily installed about at least one of said plurality of primary foundation pier segments, said lifting platform configured to support a lifting assembly configured to lift said structural element such that said pier cap assembly may be installed and said lifting platform, said lifting platform comprising an interlocking first plate and second plate, wherein said first plate and second plate are assembled to form said lifting platform without fasteners;
- said plurality of primary foundation pier segments each including a top portion and a base portion, said top portion of each said plurality of primary foundation pier segments configured to be engaged with the base portion of another of said plurality of primary foundation pier segments or a base portion of said top pier segment;
- said base pier segment comprising a top portion configured to be engaged with one of the base portions of said plurality of primary foundation pier segments;
- and
- said plurality of primary foundation pier segments stacked concentrically such that a single vertical axis of support is created through said plurality of primary foundation pier segments.
A method of providing structural support to a building structure, the method comprising the steps:
- installing a base pier segment into the earth beneath a portion of a building structure, said base pier segment including a top portion;
- installing at least one primary foundation pier segment above said base pier segment, wherein each of said at least one primary foundation pier segments includes a base portion and a top portion, and wherein a first of said base portion of said at least one primary foundation pier segments is configured to receive said top portion of said base pier segment, and wherein said top portion of said at least one primary foundation pier segment is configured to be received within a base portion of another primary foundation pier segment or a base portion of a top pier segment;
- installing said top pier segment above said at least one primary foundation pier segment, said top pier segment including a top portion;
- installing a temporary lifting platform about one of said top pier segment or said at least one primary foundation pier segment, said temporary lifting platform comprising an interlocking first plate and second plate, wherein said first plate and second plate are assembled to form said temporary lifting platform without fasteners;
- placing a lifting assembly on a top face of said temporary lifting platform and temporarily lifting said structure away from said lifting platform with said lifting assembly;
- installing a pier cap about said top portion of said top pier segment;
- installing at least one shim about said to portion of said top pier segment, wherein said at least one shim is contained within said pier cap;
- lowering said structure with said lifting assembly;
- removing said lifting assembly and said temporary lifting platform;
- wherein said first plate of said temporary lifting assembly having a top side and a rear side meeting at a 90° bend thereby forming a generally “L” shape, a top lip perpendicular to said top side and a bottom lip perpendicular to said rear side;
- wherein said second plate of said temporary lifting assembly having a top side and a rear side meeting at a 90° bend thereby forming a generally “L” shape, a top lip perpendicular to said top side and a bottom lip perpendicular to said rear side;
- wherein said first plate top lip configured for engaging with an outer face of said second plate about said 90° bend thereof;
- wherein said second plate top lip configured for engaging with an inner face of said first plate about said 90° bend thereof;
- wherein said first plate bottom lip configured to rest atop said second plate bottom lip;
- wherein said lifting assembly comprising a pair of jacks configured for temporary placement on a top face of said lifting platform;
- and
- wherein said pair of jacks are configured to at least marginally lift said structure away from said lifting assembly to allow for installation of said pier cap and said at least one shim.
A method of providing structural support to a building structure, the method comprising the steps:
- installing a base pier segment into the earth beneath a portion of a building structure, said base pier segment including a top portion;
- installing at least one primary foundation pier segment above said base pier segment, wherein each of said at least one primary foundation pier segments includes a base portion and a top portion, and wherein a first of said base portion of said at least one primary foundation pier segments is configured to receive said top portion of said base pier segment, and wherein said top portion of said at least one primary foundation pier segment is configured to be received within a base portion of another primary foundation pier segment or a base portion of a top pier segment;
- installing said top pier segment above said at least one primary foundation pier segment, said top pier segment including a top portion;
- installing a temporary lifting platform about one of said top pier segment or said at least one primary foundation pier segment, said temporary lifting platform comprising an interlocking first plate and second plate, wherein said first plate and second plate are assembled to form said temporary lifting platform without fasteners;
- placing a lifting assembly on a top face of said temporary lifting platform and temporarily lifting said structure away from said lifting platform with said lifting assembly;
- installing a pier cap about said top portion of said top pier segment;
- installing at least one shim about said to portion of said top pier segment, wherein said at least one shim is contained within said pier cap;
- lowering said structure with said lifting assembly;
- removing said lifting assembly and said temporary lifting platform;
- said pier cap comprising a front plate, a back plate, and a top plate, wherein said back plate and said top plate are rigidly affixed together and said front plate is removably affixed to said back plate by a plurality of carriage bolts and nuts;
- said top pier segment including a top portion configured to be received at least partially within said pier cap;
- and
- wherein said at least one shim is placed over said top portion of said top pier segment within said pier cap such that said pier cap presses said at least one shim firmly between said pier cap and said top portion of said top pier segment.
Dependencies are inferred from the claim text.