A method of protecting a wood-framed building against fire while under construction on a job site location in accordance with a wood-framed building project having a construction phase, said method comprising the steps of:
- (a) after completing each said wood-framed building section during said construction phase, where wood framing has been constructed and sheathing installed, but before any wallboard or wall board covering has been installed, spraying a clean fire inhibiting chemical (CFIC) liquid from a liquid spraying system, as a spray coating, over all exposed interior wood surfaces in said completed wood-framed building section so to provide Class-A fire-protection to and over each completed wood-framed building section;
- (b) after each said completed wood-framed building section has been spray coated with said CFIC liquid, posting fire-protection certifications in said completed wood-framed building section after being spray coated with said CFIC liquid and provided with Class-A fire-protection;
- (c) before applying wallboard and/or other wall board covering over said spray-coated completed wood-framed building section, using a first mobile computing system to capture and collect digital photographs and/or videos of fire-protection certification postings in said spray-coated completed wood-framed building section;
- (d) using said first mobile computing system to upload to a central database on a wireless information network, said captured digital photographs and/or videos of fire-protection certification postings in completed wood-framed building sections, and Class-A fire-protected status information indicating that said completed wood-framed building sections have been spray coated with said CFIC liquid and provided with Class-A fire-protection, along with said Class-A fire-protected status information, and
- (e) upon the outbreak of a fire in said wood-framed building, using a second mobile computing system to remotely access said central database and determine the Class-A fire-protected status of specific completed sections of the wood-framed building provided by the CFIC liquid spray treatment of said wood-framed building sections during the construction phase, and instantly inform firefighters arriving on the job site location, and tasked with fighting said fire outbreak, that specific completed wood-framed building sections have been treated with Class-A fire-protection during said construction phase.