Current sensor and smart meter
AssigneeKabushiki Kaisha Toshiba
InventorsYoshihiro Higashi, Hideaki Fukuzawa, Tetsuro Wamura, Masakazu Yaginuma, Motomichi Shibano
Life of this patent
Estimating the term…
Loading patent…
AssigneeKabushiki Kaisha Toshiba
InventorsYoshihiro Higashi, Hideaki Fukuzawa, Tetsuro Wamura, Masakazu Yaginuma, Motomichi Shibano
Estimating the term…
A full bridge circuit comprises first to fourth magnetic resistance elements. The first and fourth magnetic resistance elements have a first polarity, while the second and third magnetic resistance elements have a second polarity. A comparison circuit compares a first value indicating a difference between a potential of a first connecting node and a first potential and a second value indicating a difference between a potential of a second connecting node and a second potential to determine presence/absence of an external magnetic field. An initial magnetization vector of a magnetization free layer of the first magnetic resistance element is the reverse of that of a magnetization free layer of the second magnetic resistance element. An initial magnetization vector of a magnetization free layer of the third magnetic resistance element is the reverse of that of a magnetization free layer of the fourth magnetic resistance element.
A sensor comprising:
A sensor comprising:
A sensor comprising:
Dependencies are inferred from the claim text.