Method and system for creating a final graded soil surface having a final soil depth
AssigneeCNH Industrial America LLC
InventorScott Andrew Elkins
Life of this patent
Estimating the term…
Loading patent…
AssigneeCNH Industrial America LLC
InventorScott Andrew Elkins
Estimating the term…
In one aspect, a method for creating a final graded soil surface may include controlling an operation of a grading implement of a work vehicle such that the grading implement removes a layer of soil from a current soil surface as the work vehicle is moved in a forward direction. The method may also include receiving an input indicative of the current soil surface being at an offset soil depth relative to the initial ungraded soil surface, with the offset soil depth differing from the final soil depth. When the current soil surface is at the offset soil depth, the method may further include adjusting a position of the grading implement to add or remove soil based on a depth differential defined between the offset soil depth and the final soil depth to create the final graded soil surface as the work vehicle is moved in the reverse direction.
A method for creating a final graded soil surface having a final soil depth relative to an initial ungraded soil surface, the method comprising:
A system for creating a final graded soil surface having a final soil depth relative to an initial ungraded soil surface, the system comprising:
Dependencies are inferred from the claim text.