Bandwidth aware resource optimization
AssigneeInternational Business Machines Corporation
InventorsSangram Alapati, Hima B. Nimmagadda, Satish K. Sadasivam
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsSangram Alapati, Hima B. Nimmagadda, Satish K. Sadasivam
Estimating the term…
An application workload is scheduled for execution by each of one or more processing cores operating in a first mode. Performance metrics for the each of the one or more processing cores and a memory component are monitored, wherein the memory component stores data necessary for the one or more processing cores to carry out instructions to complete the scheduled workload. If performance metrics are greater than a specified threshold, a number of the one or more processing cores handling the scheduled workload is reduced. If the performance metrics are not greater than the specified threshold, whether each of the processing cores of the processor is currently handling a scheduled workload is determined. If each of the processing cores of the processor is currently handling the scheduled workload, the processor is configured to operate in a second mode.
A method comprising:
A computer program product comprising:
A computer system comprising:
Dependencies are inferred from the claim text.