Method for low load operation of a power plant with a once-through boiler
AssigneeGeneral Electric Technology GmbH
InventorsVolker Schüle, Stephan Hellweg, Reinhard Leithner, Niels Brinkmeier
Life of this patent
Estimating the term…
Loading patent…
AssigneeGeneral Electric Technology GmbH
InventorsVolker Schüle, Stephan Hellweg, Reinhard Leithner, Niels Brinkmeier
Estimating the term…
The once-through boiler includes a water supply and at least an economizer, an evaporator superheater. No valves are provided between the economizer, the evaporator and the superheater. The high-pressure turbine includes a control valve. The method for low load operation of a power plant with a once-through boiler and a high pressure turbine includes providing a parameter indicative of the stable operation of the once-through boiler in once-through operation, and on the basis of this parameter adjusting the control valve in order to regulate the pressure within the economizer and evaporator and/or adjusting the temperature of the water supplied to the economizer.
A method for low load operation of a power plant having a once-through boiler and at least one high pressure turbine, the once-through boiler having a water supply and an economizer, an evaporator and a superheater, the at least one high-pressure turbine comprising a control valve, the method comprising:
Dependencies are inferred from the claim text.