Method for waterproofing railway bridges and waterproofing material for carrying out said method
OwnerChristiano Rangoniinventor
Life of this patent
Estimating the term…
Loading patent…
OwnerChristiano Rangoniinventor
Estimating the term…
A method for waterproofing of bridges (1) and similar structures aimed at railway traffic is described, the structures comprising an arch or deck structure, on which there is placed a ballast (M) of gravel or crushed stone (2) upon which the tracks (6) extend between the two ends of the bridge (1). The waterproofing is obtained first by the removal of the tracks (6) and a reduced layer (S) of gravel or crushed stone (2), leaving in place the remaining part of gravel or crushed stone (2), and then by laying one or more sheets (10) of cured rubber on the remaining part of gravel or crushed stone (2). The thickness of the rubber is such as to be sufficiently resistant to perforation by the gravel or crushed stone (2), which is subsequently placed thereon to complete the ballast, Finally, the previously removed tracks (6) are set in place again. According to the method, a joint is made between the sheets (10) by means of a connection of mechanical type, with a positive locking shape fit, or a chemical bond using a suitable adhesive.
A method for waterproofing of a section of railway line or railway bridge or structure that supports rail traffic on a plurality of tracks (6), including a ballast (M) that includes gravel or crushed stone (2) upon which at least one track (6) extends, with waterproofing (10) placed between the ballast (M) and a support surface of the section of railway line or railway bridge (1) or structure that supports rail traffic, the method comprising:
A method for waterproofing of a section of railway line or railway bridge or structure that supports rail traffic on a plurality of tracks (6), including a ballast (M) that includes gravel or crushed stone (2) upon which at least one track (6) extends, with waterproofing (10) placed between the ballast (M) and a support surface of the section of railway line or railway bridge (1) or structure that supports rail traffic, the method comprising:
A method for waterproofing of a section of railway line or railway bridge or structure that supports rail traffic on a plurality of tracks (6), including a ballast (M) that includes gravel or crushed stone (2) upon which at least one track (6) extends, with waterproofing (10) placed between the ballast (M) and a support surface of the section of railway line or railway bridge (1) or structure that supports rail traffic, the method comprising:
A method for waterproofing of a section of railway line or railway bridge or structure that supports rail traffic on a plurality of tracks (6), including a ballast (M) that includes gravel or crushed stone (2) upon which at least one track (6) extends, with waterproofing (10) placed between the ballast (M) and a support surface of the section of railway line or railway bridge (1) or structure that supports rail traffic, the method comprising:
A method for waterproofing of a section of railway line or railway bridge or structure that supports rail traffic on a plurality of tracks (6), including a ballast (M) that includes gravel or crushed stone (2) upon which at least one track (6) extends, with waterproofing (10) placed between the ballast (M) and a support surface of the section of railway line or railway bridge (1) or structure that supports rail traffic, the method comprising: