# US 10,119,371 B2 · Flexible line installation and removal

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,119,371 B2
- Document ID: US10119371B2
- Status: Granted
- Kind: B2
- Application number: 15/319,677
- Filed: 2014-06-18
- Published: 2017-05-04
- Granted: 2018-11-06
- Earliest claimed: 2014-06-18
- Assignees: Statoil Petroleum AS
- Applicants: Statoil Petroleum AS
- Inventors: Steinar Kristoffersen; Guillaume Gravey; Øyvind Haug
- Web page: https://patentgrep.com/patent/US10119371B2

## CPC

- E21B 43/0135: {using a pulling cable}
- E21B 17/012: {with buoyancy elements (E21B17/015 takes precedence)}
- E21B 17/015: {Non-vertical risers, e.g. articulated or catenary-type}
- E21B 19/004: {supporting a riser from a drilling or production platform}
- E21B 19/008: {Winding units, specially adapted for drilling operations}
- E21B 19/22: Handling reeled pipe or rod units, e.g. flexible drilling pipes {(lifting or hauling appliances using two or more cooperating endless chains B66D3/003)}
- E21B 43/0107: {Connecting of flow lines to offshore structures (E21B43/013 takes precedence)}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method of removing a flexible line deployed between an offshore platform and a subsea structure, where the platform has a landing deck on which the flexible line is installed, the landing deck facing away from the platform towards an installation side. The method comprises: decoupling a topside end of the flexible line from the landing deck; lowering the topside end from the landing deck to the sea bed using a platform mounted winch, and detaching the winch from the topside end; moving the platform in a direction away from the installation side and positioning an installation vessel on the installation side; lowering a recovery line from the installation vessel and attaching an end of the recovery line to the topside or subsea end of the riser; raising the attached topside or subsea end onto the installation vessel from the seabed using the recovery line; and recovering the flexible line onto the installation vessel, whereupon the platform can be moved back to an operating position.

## Claims

### Claim 1

A method of removing a flexible line deployed between an offshore platform and a subsea structure, where the platform has a landing deck on which the flexible line is installed, the landing deck facing away from the platform towards an installation side, the method comprising:
decoupling a topside end of the flexible line from the landing deck;
lowering the topside end from the landing deck to the sea bed using a platform mounted winch, and detaching the winch from the topside end;
moving the platform in a direction away from the installation side and away from the topside end and positioning an installation vessel on the installation side by moving the installation vessel towards the subsea structure;
lowering a recovery line from the installation vessel and attaching an end of the recovery line to the topside end of the flexible line or a subsea end of the flexible line;
raising the attached topside or subsea end onto the installation vessel from the seabed using the recovery line; and
recovering the flexible line onto the installation vessel,
whereupon the platform can be moved back to an operating position located substantially above the subsea structure.

### Claim 2 (depends on 1)

The method according to claim 1, further comprising, prior to decoupling the topside end of the flexible line from the landing deck and lowering the topside end from the landing deck, moving the platform in a direction towards the installation vessel.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the recovery line on the installation vessel is extended substantially to its maximum extent from the installation vessel towards the platform.

### Claim 4 (depends on 1)

The method according to claim 1, further comprising attaching the end of the recovery line to the topside or subsea end of the flexible line using a Remotely Operated Vessel, ROV.

### Claim 5 (depends on 1)

The method according to claim 1, further comprising disconnecting the winch from the topside end of the flexible line using an ROV.

### Claim 6 (depends on 1)

The method according to claim 1, further comprising, after said step of recovering the flexible line onto the installation vessel, moving the installation vessel in a direction away from the landing deck and relocating the platform to said operating position.

### Claim 7 (depends on 1)

The method according to claim 1, wherein the flexible line is a riser for conveying hydrocarbons from a subsea well to an offshore platform, and said landing deck is a riser balcony.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the flexible line is deployed between the offshore platform and the subsea structure in a pliant wave configuration.

### Claim 9 (depends on 1)

The method according claim 1, wherein an exclusion zone surrounds the landing deck of the offshore platform, and wherein the exclusion zone is defined such that hydrocarbon production must be ceased if a vessel enters the exclusion zone.

### Claim 10 (depends on 1)

The method according to claim 1, wherein the platform is moored using mooring lines and said step(s) of moving the platform comprises pulling in and playing out the mooring lines.

### Claim 11

A method of installing a flexible line between an offshore platform and a subsea structure, where the platform has a landing deck for landing the flexible line, the landing deck facing away from the platform towards an installation side, the method comprising:
moving the platform in a direction away from the installation side and positioning an installation vessel on the installation side towards the subsea structure;
lowering a topside end of the flexible line from the installation vessel;
moving the installation vessel away from the topside end and away from the installation side and moving the platform in a direction towards the topside end; and
installing the topside end to the landing deck and installing a subsea end of the flexible line to the subsea structure.

### Claim 12 (depends on 11)

The method according to claim 11, further comprising, before lowering the topside end of the flexible line from the installation vessel, lowering the subsea end of the flexible line from the installation vessel using a winch mounted on the installation vessel.

### Claim 13 (depends on 12)

The method according to claim 12, further comprising, after lowering the subsea end of the flexible line from the installation vessel, disconnecting the winch line from the subsea end of the flexible line and coupling the subsea end to the subsea structure.

### Claim 14 (depends on 13)

The method according to claim 13, further comprising pulling the subsea end of the flexible line to the subsea structure using an ROV or a pull in wire depending from the platform.

### Claim 15 (depends on 13)

The method according to claim 13, further comprising pulling the subsea end of the flexible line to the subsea structure using a pull in wire depending from the platform.

### Claim 16 (depends on 13)

The method according to claim 13, further comprising disconnecting the winch from the subsea end and coupling the subsea end to the subsea structure using an ROV.

### Claim 17 (depends on 11)

The method according to claim 11, further comprising, after moving the platform in a direction away from the installation side and prior to lowering a topside end of the flexible line from the installation vessel, installing buoyancy aids and/or weights on the flexible line and tethering the flexible line to a subsea anchor.

### Claim 18 (depends on 11)

The method according to claim 11, further comprising attaching the end of the pull in line to the topside end of the flexible line using an ROV.

### Claim 19 (depends on 11)

The method according to claim 11, wherein the flexible line is a riser for conveying hydrocarbons from a subsea well to an offshore platform, and said landing deck is a riser balcony.

### Claim 20 (depends on 11)

The method according to claim 11, wherein the flexible line is deployed between the offshore platform and the subsea structure in a pliant wave configuration.

### Claim 21 (depends on 11)

The method according to claim 11, wherein an exclusion zone surrounds the landing deck of the offshore platform, and wherein the exclusion zone is defined such that hydrocarbon production must be ceased if a vessel enters the exclusion zone.

### Claim 22 (depends on 11)

The method according to claim 11, wherein the platform is moored using mooring lines and said step(s) of moving the platform comprises pulling in and playing out the mooring lines.
