Solvent and gas injection recovery process
AssigneeStatoil ASA
InventorsLars Høier, Jostein Alvestad, Aurelie Lagisquet, Eimund Gilje
Life of this patent
Estimating the term…
Loading patent…
AssigneeStatoil ASA
InventorsLars Høier, Jostein Alvestad, Aurelie Lagisquet, Eimund Gilje
Estimating the term…
A process for the recovery of hydrocarbon such as bitumen/EHO from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps: preheating an area around and between the wells by circulating hot solvent through the completed interval of each of the wells until sufficient hydraulic communication between both wells is achieved; injecting one or more hydrocarbon solvents into the upper injection well at or above critical temperature of the solvent or solvent mixture, thereby causing a mixture of hydrocarbon and solvent to flow by gravity drainage to the lower production well; and producing the hydrocarbon to the surface through the lower production well. A non-condensable gas may be injected into the solvent chamber created by the hydrocarbon solvent.
A process for the recovery of hydrocarbons from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps:
A process for the recovery of hydrocarbons from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps:
A process for the recovery of hydrocarbons from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps:
A process for the recovery of hydrocarbons from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps:
Dependencies are inferred from the claim text.