Method and device for identifying a power equipment work pattern
AssigneeHusqvarna AB
InventorMikael Willgert
Life of this patent
Estimating the term…
Abstract
An outdoor power tool activity monitoring device is provided. The device may include processing circuitry configured for receiving indications of device activity of the outdoor power tool, determining whether the device activity correlates to a predefined work pattern, determining a set of instructions associated with the predefined work pattern in response to the device activity correlating to the predefined work pattern, and initiating provision of the set of instructions to define a programmed response to the predefined work pattern.
Claims20
An outdoor power tool activity monitoring device comprising processing circuitry configured to:
- receive indications of device activity of the outdoor power tool, wherein the outdoor power tool is a mobile, handheld outdoor power tool, and wherein receiving the indications of device activity comprises receiving movement information;
- determine whether the device activity correlates to a predefined work pattern;
- in response to the device activity correlating to the predefined work pattern, determine a set of instructions associated with the predefined work pattern;
- and
- initiate provision of the set of instructions to define a programmed response to the predefined work pattern.
A method of utilizing work pattern analysis in relation to operation of an outdoor power tool, the method comprising:
- receiving indications of device activity of the outdoor power tool, wherein the outdoor power tool is a mobile, handheld outdoor power tool, and wherein receiving the indications of device activity comprises receiving movement information;
- determining, via processing circuitry, whether the device activity correlates to a predefined work pattern;
- in response to the device activity correlating to the predefined work pattern, determining a set of instructions associated with the predefined work pattern;
- and
- initiating provision of the set of instructions to define a programmed response to the predefined work pattern.
Dependencies are inferred from the claim text.