Reducing curtailment of wind power generation
AssigneeInternational Business Machines Corporation
InventorsVarun Badrinath Krishna, Younghun Kim, Tarun Kumar, Wander S. Wadman, Kevin W. Warren
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsVarun Badrinath Krishna, Younghun Kim, Tarun Kumar, Wander S. Wadman, Kevin W. Warren
Estimating the term…
Historical power output measurements of a wind turbine for a time period immediately preceding a specified time are received. Historical wind speed micro-forecasts for the wind turbine for a time periods immediately preceding the specified past time and immediately following the specified past time are received. The historical wind speed micro-forecasts are converted to wind power values. Based on the historical power output measurements and the wind power output values, a machine learning model for predicting wind power output is trained. Real-time power output measurements of the wind turbine and real-time wind speed micro-forecasts for the wind turbine are received. The real-time wind speed micro-forecasts are converted to real-time wind power values. Using the machine learning model with the real-time power output measurements and the real-time wind power values, a wind power output forecast for the wind turbine at a future time is outputted.
A method comprising:
Dependencies are inferred from the claim text.